"Tell Julian Cross that hell will freeze before he chairs a committee on my mother's building," I said into the receiver.
I set the desk telephone down onto its cradle with a sharp, definitive click.
David Sterling had not argued on the other end of the line. The LaSalle Capital lender understood the boundary I had drawn. Preston Whitmore wanted to trade Locke Urban's frozen cranes for corporate supervision over Docket 944. If I signed that agreement, Cross would hold the red pencil over every blueprint, every invoice, and every historic archive Evelyn Sutton had left behind.
I would rather dig the foundation trenches with my bare hands.
Nora Kim stood by the coat rack in Suite 4000, wrapping her cashmere scarf around her neck. "Harold Pike is waiting for us in Room 604. The Building Commission convened early to review the procurement filing."
"Let's go," I said, picking up my portfolio case.
The morning wind off the Chicago River was fierce as our cab crossed the bridge toward City Hall. Snowflakes danced against the glass, scattering over the gray limestone columns of 121 North LaSalle Street.
Room 604 was quiet when we entered. The elevated mahogany dais where the Public Building Commission held its formal public hearings was empty, but in the adjoining conference room, Commissioner Harold Pike sat at the end of a long walnut table, his reading glasses propped on his white hair.
Before him lay the municipal contract folio for Docket 944, flanked by Julian Cross's fresh notice of change in beneficial ownership.
Pike looked up as Nora and I took seats across from him.
"Claire," the veteran engineer said, his voice deep and gravelly. "I read the filing from Cross. LaSalle Capital confirmed the Delaware assignment this morning. Is it true? Does Preston Whitmore hold fifty-one percent of Locke Urban?"
"He holds the voting units under an interim mezzanine assignment," I answered plainly. "Adrian Locke has a ninety-day repurchase clause. He is assembling the buyout pool now."
"Ninety days is an eternity in municipal contracting," Pike said, tapping his pencil against the contract docket. "Under Section Twelve, your sixty-day performance window has forty-two days left. The municipal code is explicit. If Vale Studio does not break ground and commence structural foundation work before that window closes, the commission is required by statute to cancel the award."